Photo Gallery

Skorpion Zinc January 2018

Skorpion Zinc refinery crushing circuit
Aerial refinery crushing circuit
Refinery milling, leach and solvent extraction
Refinery acid plant
Refinery acid plant & solvent extraction
Skorpion Zinc evaporation ponds
Pit 112
Tipping station for jaw-crusher
Final product ingot casting
Skimming of final metal ingot production

Skorpion Zinc April 2017

/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize

Skorpion Zinc July 2018

Skorpion Zinc up-view 
Skorpion Zinc administration area up-view
Tutungeni settlement, Rosh Pinah
Out-going truck, Skorpion Zinc
Stepping Stones Pre-Primary School, Rosh Pinah
Waste stripping operation at the Western Pushback of Pit 112
A Liebherr 9200 digger doing waste stripping operation at the Western Pushback of Pit 112
Waste stripping in the Western Pushback 
A 90-tonne dump truck lining up to be loaded at the Western Pushback
A Liebherr 984 excavator in action mining ore at the Pit bottom 
A Liebherr 984 excavator in action mining ore at the Pit bottom 
Dust suppression in the Western Pushback
Waste stripping in the Pit 112 Southern Extension
Dump trucks arriving at the loading face for the start of shift
Birds' eye view of waste stripping in the Pit 112 Western Pushback 
Dump trucks reporting for duty at start of shift in the Western Pushback

Skorpion Zinc July 2017

/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize